Long footing trench with wood forms and tied rebar, vertical bars standing along the cut slope

Concrete and foundations,set true from the start

Footings, stem walls, slabs and flatwork as part of the build, set out so everything on top starts level and square.

Concrete & Foundations

The ground everyhouse stands on

A house is only as true as what it stands on. On new homes, additions and ADUs we run the foundation: layout, excavation, forms, rebar, inspection and the pour, on flat lots and hillside sites, coordinated with the engineering before the first bucket goes in. Concrete-only jobs go to licensed concrete partners we coordinate.

What’s included04 parts

  • Layout and excavation

    Lines set to the plans, trenches and pads dug to the depth the engineering calls for.

  • Forms and rebar

    Forms braced true and rebar tied and inspected before any concrete arrives.

  • Footings, stem walls, slabs

    Poured, finished and cured as the foundation the framing sits on.

  • Flatwork with the build

    Driveways, walks, patios and pads, sloped so water runs away from the house.

In depth

How we build footings,slabs and foundation walls

What the soil decides, what the code asks of a footing, what the inspector checks before the pour, and what changes the time and the cost of the concrete.

The part of the house you can't fix later

Concrete and foundations are one of our core specialties. The framing, the floors and the finishes all depend on footings that sit where the plans say, at the depth and with the steel the plans call for. Once the concrete is in, fixing any of it takes a saw.

Aaron is on site for this stage. He checks layout, forms and steel before anything gets covered, and the same management team carries the job on into framing.

Any permit applied for since January 1, 2026 falls under the 2025 California Building Standards Code (Title 24). Glendora, Pasadena, Long Beach, Rancho Cucamonga, the City of Los Angeles and LA County each enforce it, sometimes with local amendments, so we confirm the rules with the city that issues the permit.

Soil comes first

We start with the soil. Under the California Residential Code (CRC), where expansive, compressible or shifting soils are likely, the building official decides whether a soil test is required. The California Building Code goes further: in areas likely to have expansive soil, the official must require tests to find it.

Some cities put the trigger in writing. Long Beach's submittal guide for one- and two-family homes asks for a soils or geotechnical report for anything more than one story, and a geologic hazard study on lots in a geologic hazard zone. LA County notes that a licensed engineer may be needed for complex soils, grading, foundations and retaining walls, and that structural plans must be stamped.

When there is a soils report, its recommendations become part of the plans and we build to them. The site also has to drain: the CRC requires the ground to fall at least 6 inches within the first 10 feet away from the foundation, or drains and swales where the lot can't allow it.

What the code asks of a footing

The CRC sets the floor, and the engineer's plans often go beyond it:

  • Footings rest on undisturbed natural soil or engineered fill.
  • A concrete footing is at least 12 inches wide and 6 inches thick, sized to the soil's bearing value.
  • Exterior footings go at least 12 inches below undisturbed ground.
  • In Seismic Design Categories D0 to D2, footings and stem walls carry No. 4 bars near the top of the wall and 3 to 4 inches above the bottom of the footing, with hooked vertical bars at no more than 4 feet apart.
  • Sill plates are held down with 1/2-inch anchor bolts no more than 6 feet apart, set at least 7 inches into the concrete, with a bolt within 12 inches of each end of every plate.

On slopes steeper than 1 in 3, the code adds setbacks from the slope face. Our guide to building on a hillside lot covers what that means in the foothills.

Slabs and the moisture under them

California's green building code (CALGreen) calls for a capillary break under slabs that need a vapor retarder: a 4-inch base of 1/2-inch or larger clean aggregate with the vapor retarder in direct contact with the concrete, or a slab designed by a licensed design professional.

Plumbing, conduit and in-slab steel all go in before the pour, and the code requires a slab and under-floor inspection at that point. On raised floors we check post bases, joist spacing and the subfloor before a single wall goes up, since the floors and walls above sit on them.

Retaining walls, flatwork and grading

Not every concrete job needs a building permit. The CRC exempts sidewalks and driveways, and retaining walls up to 4 feet measured from the bottom of the footing, unless they hold back a surcharge such as a slope or a driveway. The exemption doesn't excuse work that breaks other local laws, so we check with the city during scoping.

Taller walls are engineered. A retaining wall that holds back more than 48 inches of unbalanced fill without support at the top, or a wall over 24 inches that carries other loads, must be designed for stability with a safety factor of 1.5 against sliding and overturning. Grading needs its own permit under the building code's grading appendix, apart from listed exemptions such as the excavation for a permitted structure.

Inspection day, time and cost

The foundation inspection happens after the trenches are dug, the forms are up and the steel is in place and supported, before any concrete. We schedule each inspection as the work reaches it, and Aaron walks the forms and steel before the inspector does (what a foundation inspection checks).

Each jurisdiction books inspections its own way. In unincorporated LA County the permit holder requests inspections online through EPIC-LA at least 24 hours ahead. Glendora aims for next-day inspections, Rancho Cucamonga offers next-day inspections Monday to Thursday, and Long Beach can charge a reinspection fee (listed at $113 as of November 2026) when work isn't ready.

What moves the time and cost of a foundation: the soils report and what it asks for, engineering for hillside lots and retaining walls, special inspections the plans require, grading permits, site access for trucks and pumps, and what we find once the ground is open. We price each of those as its own line, as explained in how a task-by-task estimate works.

Sources

What it covers

From the layoutto the last pour

The full list, in the groups we work in. Ask about any of it when we walk the project.

01Foundations

  • Footings and stem walls
  • Slab-on-grade
  • Raised foundations and post bases
  • Hillside foundations
  • Foundation and subfloor checks

02Site work

  • Excavation and grading
  • Trenching
  • Rebar and forming
  • Site cleanup

03Flatwork

  • Driveways
  • Walkways and steps
  • Patios
  • Equipment pads

Job sites

From ourjob sites

Photos from the work itself. Open one to see it large on the projects page.

How we work

Four steps,in this order

Walk it, scope it, price it by the task, put it in writing. Then we build it.

  1. 01

    Walk the project

    We visit the property, look at the existing conditions, take measurements and photos, and listen to what you want from it.

  2. 02

    Scope and plan it

    We define the work, the materials and the permits it needs, and bring in the designer or engineer when the job calls for one.

  3. 03

    Price it by the task

    The job is broken into tasks, each with what’s included, its cost and what you get. Open selections carry stated allowances.

  4. 04

    Put it in writing

    Scope, price, payments and schedule go into a written agreement. Permits are in hand before that work starts.

Before we begin

Questions wehear most often

Something else on your mind? Call us at (562) 340-8847

01Do I need a soils report for a new foundation?

It depends on the lot and the city. The building official can require one where expansive or unstable soils are likely, and some cities ask for one by default, such as Long Beach for anything more than one story. When a report exists, we build to its recommendations.

02How deep does a footing have to go?

Under the California Residential Code, exterior footings sit at least 12 inches below undisturbed ground and are at least 12 inches wide. The engineer's plans and the soils report often call for more, and those govern.

03Does a retaining wall need a permit?

A wall up to 4 feet from the bottom of the footing to the top, with no slope or load behind it, is exempt from a building permit under the state code. Taller walls, or walls holding back a slope or driveway, need a permit and engineering.

04What happens at the foundation inspection?

The inspector checks the excavation, the forms and the reinforcing steel against the approved plans before concrete is placed. Nothing gets poured until that inspection is signed off.

05Can a driveway or walkway go in without a permit?

The state residential code lists sidewalks and driveways as exempt from a building permit. Other local rules can still apply, so we confirm with your city before we form anything.

06Why does the slab need gravel and plastic under it?

That layer keeps ground moisture from wicking up into the slab and the floors on top of it. CALGreen calls for a 4-inch aggregate base with a vapor retarder against the concrete, or an engineered slab design.

Related services

Often part ofthe same project

Most projects need more than one of these. One team runs all of it.

02

Framing & Structural

Walls, floors and roofs framed true, square and plumb, with the headers, hangers and steel the drawings call for.

Wall framing · Roof framing · Structural steel · Subfloor

View service
03

New Construction

New homes built from the ground up, managed as one job from the first site walk to the keys.

Ground-up homes · Hillside lots · Turnkey · Permits

View service
04

Additions & ADUs

Room additions, second storeys and accessory dwelling units, tied into the house you already have.

ADUs · Room additions · Second storeys · Garage conversions

View service

Free estimate

Tell us whatyou want to build

Call (562) 340-8847 or send the short form. We walk the project first, then price it task by task.