Arched walk-in shower in white marble with a diamond-pattern niche, brass fixtures and a mosaic floor

Kitchens and baths,rebuilt in order

Kitchens and bathrooms taken down to the studs where they need it and rebuilt with the trades in order.

Kitchen & Bath Remodels

The most tradesin the least space

Kitchens and baths carry the most trades in the least space: plumbing, electrical, tile, cabinets, counters and fixtures. We sequence them, check what’s behind the walls before they close, and carry selections as stated allowances so the budget stays clear.

What’s included04 parts

  • Down to what’s sound

    Demolition, then the framing and subfloor checked and repaired.

  • Rough-ins inspected

    Plumbing and electrical moved to the new layout and inspected.

  • Tile, cabinets, counters

    Showers, floors, cabinets and counters set level and true.

  • Allowances you can see

    Tile and fixtures carried as stated allowances, adjusted when you choose.

In depth

How we remodelkitchens and bathrooms

What needs a permit, the water, lighting and ventilation rules a permitted remodel brings with it, how allowances work, and what to settle before demolition.

What needs a permit

Not everything in a remodel does. The 2025 California Residential Code (CRC) exempts painting, papering, tiling, carpeting, cabinets, countertops and similar finish work from a building permit. Moving a wall, a drain, a gas line or a circuit is another matter: the code excludes cutting away a wall and relocating water, drain, gas or vent piping or electrical wiring from ordinary repairs.

Most kitchen and bath remodels end up with a permit. We identify the permits during scoping and obtain them before that work starts. Simple plans in LA County can be checked over the counter, and inspections follow the work: rough plumbing and electrical before the walls close, and a final at the end.

Water-saving fixtures, house-wide

Under California Civil Code Section 1101.4, any permitted alteration or improvement to a single-family home comes with a condition: before final approval, the permit applicant replaces every noncompliant plumbing fixture in the house with a water-conserving one. The rule covers the whole house, including bathrooms we never touch.

A fixture is noncompliant if it is a toilet made to use more than 1.6 gallons per flush, a showerhead over 2.5 gallons per minute, or an interior faucet over 2.2 gallons per minute. Replacements have to meet the standards for new homes, which CALGreen sets at:

  • toilets: 1.28 gallons per flush at most;
  • showerheads: 1.8 gallons per minute at 80 psi;
  • bathroom faucets: 1.2 gallons per minute at 60 psi;
  • kitchen faucets: 1.8 gallons per minute at 60 psi, with a temporary boost to 2.2 allowed.

We check the other bathrooms during the walkthrough, so any extra fixtures are in the estimate from the start.

Light and air

The 2025 Energy Code applies to the lighting you change. Altered lighting has to meet Section 150.0(k):

  • Every new luminaire and light source is certified to the state's JA8 efficacy standard.
  • In bathrooms, at least one luminaire is on an occupancy or vacancy sensor that turns it off.
  • In kitchens and other living spaces, lights get wall-mounted dimmers.
  • Lights built into a range hood or bath fan are switched separately from the fan, and don't need dimming.
  • Existing recessed cans can keep their screw-base sockets if they get JA8-compliant trims or lamps.

The Energy Code's mandatory measures call for a local exhaust system in every kitchen and bathroom, and a new range hood or bath fan installed in a remodel has to meet the ventilation rules in Section 150.0(o) for airflow, sound and controls.

Alarms, and homes built before 1978

Permit work in a home also brings smoke alarms up to date. When alterations that need a permit happen, the CRC requires smoke alarms in the dwelling where they would be required in a new home, and the state's Health and Safety Code ties the same duty to permits for work over $1,000.

Older homes add a lead question. In housing built before 1978, the EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint, including remodeling, plumbing, electrical and carpentry. Work is covered unless the paint is shown to be lead-free, and minor jobs that disturb 6 square feet of paint or less per room inside are the main exception (window replacement is always covered).

Selections, allowances and the level of finish

A tighter budget changes the finish level. Framing, waterproofing, levels, layout and trim tolerances stay the same whether the finish is painted shaker cabinets and large-format ceramic tile, or white oak millwork and book-matched stone. You choose the finish, and the work behind the wall stays at one standard.

We settle drawings, materials and selections before demolition starts. Anything not yet chosen, such as tile or fixtures, is carried as an allowance: a stated budget that is adjusted to the actual cost, up or down, when you choose.

Plumbing, electrical and HVAC come from licensed trade partners we schedule and coordinate under one plan, and Aaron checks the work before walls and floors close.

What changes time and cost

Walls and floors hide things. If we open one and find rot, old wiring or failed plumbing, we stop work on that item, photograph it, explain the options, and give you the added cost and schedule effect in writing. Nothing outside the agreed scope goes ahead without your written approval, except immediate action for safety or required by law.

Other drivers are the fixture replacements elsewhere in the house, the inspections each stage needs, and how soon selections are made. Our estimates list each phase as its own line, from protection and demolition to close-out (how a task-by-task estimate works).

Sources

What it covers

From demolitionto the last fixture

The full list, in the groups we work in. Ask about any of it when we walk the project.

01Kitchens

  • Layout changes
  • Cabinets and counters
  • Islands
  • Lighting and appliances coordination

02Bathrooms

  • Showers and tubs
  • Vanities
  • Tile floors and walls
  • Fixtures and glass

03Behind the walls

  • Demolition and protection
  • Framing and subfloor repair
  • Rough plumbing and electrical
  • Drywall and paint

Job sites

From ourjob sites

Photos from the work itself. Open one to see it large on the projects page.

How we work

Four steps,in this order

Walk it, scope it, price it by the task, put it in writing. Then we build it.

  1. 01

    Walk the project

    We visit the property, look at the existing conditions, take measurements and photos, and listen to what you want from it.

  2. 02

    Scope and plan it

    We define the work, the materials and the permits it needs, and bring in the designer or engineer when the job calls for one.

  3. 03

    Price it by the task

    The job is broken into tasks, each with what’s included, its cost and what you get. Open selections carry stated allowances.

  4. 04

    Put it in writing

    Scope, price, payments and schedule go into a written agreement. Permits are in hand before that work starts.

Before we begin

Questions wehear most often

Something else on your mind? Call us at (562) 340-8847

01Do I need a permit to remodel my kitchen?

New cabinets, countertops, tile and paint alone don't need one under the state code. Moving plumbing, gas, walls or electrical does, and most full remodels include at least one of those.

02Will I have to replace fixtures in other bathrooms?

Possibly. California Civil Code Section 1101.4 makes replacing every noncompliant plumbing fixture in a single-family home a condition of final approval for any permitted alteration. We check the whole house before we price the job.

03What is an allowance?

A stated budget for something not yet chosen, such as tile or a vanity. When you pick it, the line is adjusted to the real cost, up or down, and the running total shows the difference.

04Do new bathroom lights need a sensor?

Yes. Under the 2025 Energy Code, at least one luminaire in a bathroom has to be controlled by an occupancy or vacancy sensor with automatic shut-off.

05My house was built before 1978. Does that change anything?

Paid work that disturbs painted surfaces falls under the EPA's lead-safe renovation rule unless the paint is shown to be lead-free. That shapes containment and cleanup, and we plan for it in the scope.

06Do you do the plumbing and electrical yourselves?

We coordinate them. Licensed plumbing, electrical and HVAC trade partners do that work under our schedule, and we run the carpentry and finish work around it.

Related services

Often part ofthe same project

Most projects need more than one of these. One team runs all of it.

01

Concrete & Foundations

Footings, stem walls, slabs and flatwork as part of the build, set out so everything on top starts level and square.

Footings · Stem walls · Slabs · Flatwork

View service
02

Framing & Structural

Walls, floors and roofs framed true, square and plumb, with the headers, hangers and steel the drawings call for.

Wall framing · Roof framing · Structural steel · Subfloor

View service
03

New Construction

New homes built from the ground up, managed as one job from the first site walk to the keys.

Ground-up homes · Hillside lots · Turnkey · Permits

View service

Free estimate

Tell us whatyou want to build

Call (562) 340-8847 or send the short form. We walk the project first, then price it task by task.