Galley kitchen with charcoal shaker cabinets, black veined counters, teal walls and a wood-look plank floor

Additions and ADUs,tied into your home

Room additions, second storeys and accessory dwelling units, tied into the house you already have.

Additions & ADUs

More room onthe lot you own

An addition or an ADU is a small house built against, on top of or behind a lived-in one. We plan the connection to the existing structure, frame it to the engineering and close it in so it reads as part of the property, not a patch on it.

What’s included04 parts

  • Feasibility first

    We walk the lot and the house, and look at what the site and the rules allow.

  • Tied into the house

    New foundations, framing and roof lines joined to the existing structure.

  • Built for its use

    Rental income, family nearby or more room, planned around how it will be lived in.

  • Permits and inspections

    Drawings, permits and inspections handled as part of the job.

In depth

How we plan and buildADUs and room additions

What state law guarantees for an accessory dwelling unit, what changed on January 1, 2026, how an addition ties into the house you already have, and what to prepare first.

Two ways to add space

An accessory dwelling unit (ADU) is a separate home on your lot, attached or detached, for rental income, family or a quiet retreat at the back of the property. An addition makes the main house bigger: a new bedroom wing, a larger kitchen, a second story. We build both, from feasibility and planning through utility and site work to a finished, turnkey unit.

ADUs run on state law that limits what a city can ask for. Additions follow the ordinary zoning and building codes.

What state law guarantees for an ADU

California's ADU law sits in the Government Code, Chapter 13, starting at Section 66310. As of 2026, the core of it reads:

  • A permit application for an ADU is approved ministerially, without discretionary review or a public hearing.
  • A detached ADU can be up to 1,200 square feet. An attached ADU can be up to half the size of the existing home.
  • A city can't cap ADU size below 850 square feet, or 1,000 square feet for more than one bedroom, and its lot coverage or setback rules can't prevent an ADU of at least 800 square feet with 4-foot side and rear setbacks.
  • A city must allow at least 16 feet of height for a detached ADU, 18 feet near major transit (plus 2 feet to match the roof pitch of the main house), and for an attached ADU 25 feet or the local limit for the main house, whichever is lower.
  • Parking is capped at one space per unit, and a garage converted or torn down for an ADU doesn't have to be replaced.
  • An ADU doesn't need fire sprinklers if the main house doesn't have them.
  • The ADU can be rented out on its own, and outside the cases in Article 4 of the law it can't be sold apart from the main house.

Some units have to be approved even where local standards say otherwise, such as one ADU plus one junior ADU inside the existing house, and one new detached ADU of up to 800 square feet with 4-foot setbacks.

Review times, fees and older units, as of 2026

SB 543, in force since January 1, 2026, amended the review section and gave the fee and legalization rules new section numbers. The review clock now reads:

  • The city has 15 business days to tell you whether the application is complete, with a list of what's missing. If it misses that window, the application is deemed complete.
  • It then has 60 days to approve or deny a complete application on a lot with an existing home. Past that, the application is deemed approved.
  • A denial comes with written comments on how to fix the application.

The fee rules moved to Section 66311.5. No impact fees apply to an ADU of 750 square feet or less, or a junior ADU of 500 square feet or less. Larger ADUs pay impact fees in proportion to the size of the main house.

Unpermitted ADUs built before January 1, 2020 have their own path in Section 66311.7. A city can't deny the permit just because the unit breaks building standards or the local ADU rules, unless the problem makes it substandard under the Health and Safety Code. Before applying, owners can get a confidential third-party code inspection from a licensed contractor to see what the unit needs.

Pre-approved plans and local rules

Cities still set objective standards for parking, height, setbacks, landscaping and design. Pre-approved plans save plan check time. The City of Los Angeles keeps a Standard Plan catalog for ADUs, and LA County offers a free County Catalog of plans pre-approved by Regional Planning and Building and Safety for unincorporated areas. Each plan is still reviewed for your lot.

LADBS notes that a new detached ADU must have solar panels. Long Beach charges school district fees on ADUs and on additions over 500 square feet. Our guide to ADU permits in LA County goes through the steps.

Additions: tying new to old

An addition has to work with the house it joins. The 2025 Energy Code sets separate rules for additions of 700 square feet or less and for larger ones, lets a small addition extend existing walls at their current depth with R-15 or R-21 cavity insulation, and doesn't require solar on additions. CALGreen applies to the new area only.

Permit work also brings the existing house up in a few places. Smoke alarms go in throughout the home where the code requires them for new dwellings, and an addition triggers carbon monoxide alarms where the house has fuel-burning appliances or an attached garage. An addition to a house without fire sprinklers doesn't have to add them.

The structural tie-in, new footings beside old ones and new framing against old framing, is engineered and shown on the plans. That is our core work: see framing and structural.

What to prepare, and what moves cost and time

We start by walking the property: lot lines, the slope, where the sewer, water and power run, and any past permits for the house. Bring a survey, old plans or photos if you have them.

Cost and time move with design and engineering, utility connections and their fees, soils and slope, fire hazard zone rules, and how many plan check rounds the city needs. We price each part by task.

Sources

What it covers

From the first walkto the inspection

The full list, in the groups we work in. Ask about any of it when we walk the project.

01ADUs

  • Detached ADUs
  • Attached ADUs
  • Garage conversions

02Additions

  • Room additions
  • Second-storey additions
  • Structural tie-ins to the existing house

03Coordination

  • Design and engineering
  • Permits and inspections
  • Utility and systems coordination

Job sites

From ourjob sites

Photos from the work itself. Open one to see it large on the projects page.

How we work

Four steps,in this order

Walk it, scope it, price it by the task, put it in writing. Then we build it.

  1. 01

    Walk the project

    We visit the property, look at the existing conditions, take measurements and photos, and listen to what you want from it.

  2. 02

    Scope and plan it

    We define the work, the materials and the permits it needs, and bring in the designer or engineer when the job calls for one.

  3. 03

    Price it by the task

    The job is broken into tasks, each with what’s included, its cost and what you get. Open selections carry stated allowances.

  4. 04

    Put it in writing

    Scope, price, payments and schedule go into a written agreement. Permits are in hand before that work starts.

Before we begin

Questions wehear most often

Something else on your mind? Call us at (562) 340-8847

01How big can my ADU be?

State law allows a detached ADU of up to 1,200 square feet and an attached ADU of up to half the size of your home. A city can't set its maximum below 850 square feet, and its local rules can't stop an ADU of at least 800 square feet with 4-foot side and rear setbacks.

02Will I pay impact fees on an ADU?

Not on an ADU of 750 square feet or less, or a junior ADU of 500 square feet or less, under Government Code Section 66311.5. Larger units pay in proportion to the main house. Utility connection fees follow separate rules.

03Does an ADU need parking?

At most one space, and often none. A garage converted or demolished to make room for an ADU doesn't have to be replaced, and LADBS notes that no parking is needed within a half mile of public transit.

04How long does the city have to approve an ADU?

As of 2026, 15 business days to confirm the application is complete and 60 days to approve or deny a complete application when a home already stands on the lot. If you ask for a delay, the clock pauses.

05Can an unpermitted ADU built before 2020 be legalized?

There is a path for it. Under Section 66311.7, a city can't deny the permit for code or ADU-rule problems unless the unit is substandard under health and safety law, and it can't charge impact fees for legalizing it.

06Do I need fire sprinklers in an ADU or addition?

Not if the main house doesn't have them. Building an ADU or adding on to an unsprinklered home doesn't trigger sprinklers.

Related services

Often part ofthe same project

Most projects need more than one of these. One team runs all of it.

01

Concrete & Foundations

Footings, stem walls, slabs and flatwork as part of the build, set out so everything on top starts level and square.

Footings · Stem walls · Slabs · Flatwork

View service
02

Framing & Structural

Walls, floors and roofs framed true, square and plumb, with the headers, hangers and steel the drawings call for.

Wall framing · Roof framing · Structural steel · Subfloor

View service
03

New Construction

New homes built from the ground up, managed as one job from the first site walk to the keys.

Ground-up homes · Hillside lots · Turnkey · Permits

View service

Free estimate

Tell us whatyou want to build

Call (562) 340-8847 or send the short form. We walk the project first, then price it task by task.