Single-story home framed around a courtyard, its multi-gabled roof fully sheathed, seen from above against a clear sky

Framing and structure,true, square and plumb

Walls, floors and roofs framed true, square and plumb, with the headers, hangers and steel the drawings call for.

Framing & Structural

Where we arestrongest

Framing is where we are strongest. Layout, subfloor and connections are checked before a wall goes up, then the structure is framed to the drawings: headers, hangers, rafter tails and blocking set to spec, not improvised on site.

What’s included04 parts

  • Subfloor checked first

    Post bases, joist spacing and subfloor flatness verified before framing starts.

  • Walls, floors, roofs

    Two-storey walls, rakes, gables and roofs set and braced.

  • Headers and connectors

    Headers, hangers, hold-downs and blocking to the engineer’s details.

  • Beams and steel

    Structural beams, posts and steel connections where the plans call for them.

In depth

How we frame, braceand connect a house

Wood framing run hands-on with Aaron on site, when an engineer's design takes over from the prescriptive code, what shear walls and hold-downs do, and what the frame inspection looks for.

Framing is our core work

Framing is the part you stand on in every room of the finished house. We run it hands-on, under one management team, and bring in licensed trade partners for the specialty work around it.

Aaron runs layout and checks the framing himself. Headers, hangers, rafter tails, blocking and connections are checked against the drawings and set to spec before anything closes them in. If the subfloor or the layout is wrong, every finish above it will show it.

The rules come from the 2025 California Residential Code (CRC), in force for permits applied for since January 1, 2026, plus whatever the engineer's plans add.

Prescriptive or engineered

The CRC has a full set of conventional wood framing rules: stud sizes and spacing, fastening schedules for every connection, and wall bracing laid out along braced wall lines. A simple house can be framed from those tables alone. Anything that falls outside them has to be designed.

  • Structural elements beyond the code's conventional limits are designed by accepted engineering practice.
  • Where any part of a wood-frame building departs from conventional framing, the building official requires that part to be stamped by a California licensed architect or engineer.
  • In Seismic Design Categories C through D2, an irregular building, such as one whose shear walls step out of line from floor to floor, must have its irregular parts engineered.

LA County's homeowner guide says structural elements of a plan must be reviewed and stamped by a licensed engineer. Long Beach's submittal guide asks for framing connections, member sizes and spans, the connection between an addition and the existing house, and stamped calculations wherever a design professional sized the shear walls.

We work with a network of engineers and architects, and we build to their details. When a detail doesn't work in the field, we ask the engineer rather than improvise.

Shear walls, hold-downs and connectors

Walls hold the house up, and some of them also keep it from racking sideways in an earthquake or high wind. Those are the shear walls, or braced wall panels. Their strength comes from the sheathing, the nail size and spacing along every panel edge, and the hold-downs that tie the ends of each wall to the foundation through anchor bolts set in the concrete.

Where the plans call for special inspection, the California Building Code lists periodic inspection of the nailing, bolting and anchoring of shear walls, diaphragms, drag struts and hold-downs in Seismic Design Categories C through F. It drops that item where the sheathing edge nails are spaced more than 4 inches apart. When the plans name a special inspector, we build those visits into the schedule.

Beams, posts and steel

Opening up a floor plan means moving loads. The CRC excludes cutting away a wall, or removing a structural beam or load-bearing support, from "ordinary repairs", so that work needs a permit. The engineer sizes the new beam, whether wood, glulam or steel, the posts under it and the footings under those posts, and names the hardware for each connection.

We build to that design: the demolition, the new beam and posts, and every connection set to the engineer's details. Special inspections apply where the plans list them.

Dry wood, rough-ins and the frame inspection

The CRC sets the order. Rough plumbing, mechanical, gas and electrical are inspected before the frame inspection. The frame inspection itself comes once the roof, framing, firestopping, draftstopping and bracing are in place and the rough trades are approved.

Moisture is part of it. CALGreen says framing may not be enclosed above 19 percent moisture content, checked with a probe or contact meter, and the CRC ties that check to the frame inspection. For new walls, the 2025 Energy Code sets the minimum insulation at R-15 in 2x4 walls and R-21 in 2x6 walls at 16 inches on center.

After insulation, the lath and drywall inspection comes before any plaster goes on or any joint gets taped. Our post on the framing inspection before drywall walks through each step.

What changes time and cost

Several of the variables come before the first stud: how much of the frame is engineered, how many rounds of plan check corrections the city sends back, and how many special inspections the plans require. On remodels, what sits inside the old walls matters too. If we uncover a concealed condition, we stop that item, photograph it, explain the options and put the added cost and time in writing before going on.

We price framing by the task, so you can see what each phase includes (how a task-by-task estimate works). The concrete and foundations page covers the anchor bolts and footings the frame sits on.

Sources

What it covers

From the subfloorto the ridge

The full list, in the groups we work in. Ask about any of it when we walk the project.

01Framing

  • Layout and line work
  • Floor and subfloor framing
  • Wall framing
  • Roof framing and sheathing

02Structural

  • Beams and posts
  • Structural steel connections
  • Headers and hardware
  • Load-bearing wall changes

03Detail

  • Blocking and backing
  • Rafter tails and exposed framing
  • Stairs and openings
  • Framing ready for inspection

Job sites

From ourjob sites

Photos from the work itself. Open one to see it large on the projects page.

How we work

Four steps,in this order

Walk it, scope it, price it by the task, put it in writing. Then we build it.

  1. 01

    Walk the project

    We visit the property, look at the existing conditions, take measurements and photos, and listen to what you want from it.

  2. 02

    Scope and plan it

    We define the work, the materials and the permits it needs, and bring in the designer or engineer when the job calls for one.

  3. 03

    Price it by the task

    The job is broken into tasks, each with what’s included, its cost and what you get. Open selections carry stated allowances.

  4. 04

    Put it in writing

    Scope, price, payments and schedule go into a written agreement. Permits are in hand before that work starts.

Before we begin

Questions wehear most often

Something else on your mind? Call us at (562) 340-8847

01Do I need an engineer for my framing?

Not always. A simple house or addition can follow the California Residential Code's conventional framing tables. Any part that goes beyond them, such as a long open span, a large opening in a shear wall or walls that don't stack, has to be designed and stamped by a California licensed engineer or architect.

02Can you remove a load-bearing wall?

Yes, with a permit and an engineered design. The engineer sizes the beam, the posts and the footings under them, and we build it to that design, connection by connection.

03What is a hold-down?

A steel connector at the end of a shear wall that ties the wall's framing to the foundation, so the wall can't lift or rock when the building is pushed sideways. It works together with the sheathing nailing and the anchor bolts in the concrete.

04What does the frame inspection check?

The inspector looks at the framing, bracing, firestopping and connections against the approved plans once the roof is on and the rough plumbing, electrical and mechanical work has passed. The framing's moisture content is verified at the same stage.

05Why does the framing have to be dry before insulation?

Wet lumber shrinks and can trap moisture inside the wall once it is closed. CALGreen sets the limit at 19 percent moisture content before walls and floors are enclosed.

06Who is on site while the house is framed?

Aaron is. He runs the layout, checks the connections against the drawings and walks the frame before anything covers it. Specialty trades come from licensed partners who work to our scope and schedule.

Related services

Often part ofthe same project

Most projects need more than one of these. One team runs all of it.

01

Concrete & Foundations

Footings, stem walls, slabs and flatwork as part of the build, set out so everything on top starts level and square.

Footings · Stem walls · Slabs · Flatwork

View service
03

New Construction

New homes built from the ground up, managed as one job from the first site walk to the keys.

Ground-up homes · Hillside lots · Turnkey · Permits

View service
04

Additions & ADUs

Room additions, second storeys and accessory dwelling units, tied into the house you already have.

ADUs · Room additions · Second storeys · Garage conversions

View service

Free estimate

Tell us whatyou want to build

Call (562) 340-8847 or send the short form. We walk the project first, then price it task by task.