Living room mid-remodel: a new framed and sheathed wall beside the stair, the ceiling opened to the insulation

Whole-home remodels,one team throughout

Whole-home renovations, open plans, stairs, doors and trim, with every trade run by one team.

Full-Home Remodels

Structure first,then the rooms

A full remodel opens walls, moves rooms and touches every system in the house. We plan the structure first, coordinate the electrical, plumbing and HVAC, and finish with flooring, drywall, doors and trim, under one point of contact from demolition to the punch list.

What’s included04 parts

  • Structure first

    Walls opened and beams set before the new plan goes in.

  • Trades coordinated

    Electrical, plumbing and HVAC scheduled by one team.

  • Finishes

    Flooring, tile, drywall, doors, trim and finish carpentry.

  • One point of contact

    One person who knows the job, from demolition to the punch list.

In depth

How we run awhole-home remodel

Structural changes inside a house you already own, what an older home brings with it, how hidden conditions and changes are handled, and how one team keeps every trade in order.

One team, from walkthrough to punch list

A whole-home remodel brings in most trades at once: demolition, framing, plumbing, electrical, HVAC, drywall, flooring, tile and finish carpentry. Most of the trouble on these jobs happens in the handoffs between them. We keep those handoffs under one management team.

We stay directly involved in the planning, coordination and oversight. Licensed trade partners handle the specialty systems, and one point of contact runs the schedule, the selections, the site and the quality checks from the first walkthrough to the punch list. Aaron is on site, checking the work before it gets covered.

We aim to respect the original architecture while changing how the house lives.

When a remodel becomes structural

Opening a kitchen to the living room, moving a stair or raising a ceiling usually means moving loads. The 2025 California Residential Code (CRC) excludes cutting away a wall or removing a beam or load-bearing support from ordinary repairs, so that work needs a permit. Where the work departs from conventional framing, the building official requires that part to be designed and stamped by a California licensed architect or engineer.

LA County adds that structural elements of a plan must be reviewed and stamped by a licensed engineer, and that complex soils, foundations and retaining walls may need one too. New beams often need new posts and new footings under them, so a structural remodel can reach all the way to the concrete. Our framing and structural page covers how we build those changes.

What an older house brings with it

Older homes carry a few rules a new one doesn't:

  • Lead paint. In housing built before 1978, the EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint, from carpentry and plumbing to electrical work, unless the paint is documented as lead-free. Window replacement and demolition of painted surfaces are always covered.
  • Heating and cooling. Under the 2025 Energy Code, replacing an air conditioner, heat pump, heating or cooling coil or air handler means the connected ducts are sealed and the result is confirmed by field verification and testing, with exceptions such as short duct runs. A replacement heating system can't use electric resistance as its main heat source, with exceptions for some homes that already heat with it.
  • Water heaters. A replacement can be gas, a heat pump water heater meeting the code's conditions, or, where the old one was electric resistance, a standard electric unit.
  • Fixtures. Any permitted alteration to a single-family home makes replacing the noncompliant toilets, showerheads and faucets in the whole house a condition of final approval. The kitchen and bath page has the numbers.

Bringing safety up to date

Permit work also updates the alarms. When alterations that need a permit happen, the CRC requires smoke alarms where a new home would have them. Carbon monoxide alarms are required in existing homes with a fuel-fired appliance or fireplace, or an attached garage that opens into the house. Fire sprinklers are not required when altering a home that doesn't already have them.

Hidden conditions and changes

Some conditions can't be seen until a wall or floor is open: rot, termite damage, undersized framing, old wiring. When we find one, we stop work on that item, document it with photos, explain the options, and give you the added cost and schedule effect in writing. Work outside the agreed scope goes ahead only with your written approval, except immediate action for safety or required by law.

Changes you ask for go the same way: a written change order with the revised price and schedule, signed before that work begins, priced like the original estimate with its own line, cost and deliverable. Items not yet selected carry an allowance that is adjusted to the actual cost when you choose. Payments are tied to defined phases of the work; our guide to checking a California contractor covers what state law says about deposits and payments.

Living with the work, and what drives time and cost

We protect floors and pathways before demolition, keep the site organized and follow your community's rules for hours, parking, deliveries, noise and debris. Where an HOA is involved, we prepare the scope, specifications and schedule its architectural review asks for.

Permits need steady progress. In LA County a permit expires when work stops for more than 180 days, and other cities set their own limits. We sequence the trades so inspections keep coming.

Time and cost move with the engineering, the older-home items above, what the walls turn out to hide, and how early selections are made. We price each phase as its own task (how a task-by-task estimate works).

Sources

What it covers

From opened wallsto the punch list

The full list, in the groups we work in. Ask about any of it when we walk the project.

01Structure

  • Wall removal and beams
  • Stairs and openings
  • Framing repairs

02Systems

  • Electrical coordination
  • Plumbing coordination
  • HVAC coordination

03Finishes

  • Flooring and tile
  • Drywall and paint
  • Doors, trim and finish carpentry
  • Ceilings and millwork

Job sites

From ourjob sites

Photos from the work itself. Open one to see it large on the projects page.

How we work

Four steps,in this order

Walk it, scope it, price it by the task, put it in writing. Then we build it.

  1. 01

    Walk the project

    We visit the property, look at the existing conditions, take measurements and photos, and listen to what you want from it.

  2. 02

    Scope and plan it

    We define the work, the materials and the permits it needs, and bring in the designer or engineer when the job calls for one.

  3. 03

    Price it by the task

    The job is broken into tasks, each with what’s included, its cost and what you get. Open selections carry stated allowances.

  4. 04

    Put it in writing

    Scope, price, payments and schedule go into a written agreement. Permits are in hand before that work starts.

Before we begin

Questions wehear most often

Something else on your mind? Call us at (562) 340-8847

01What happens if you find something unexpected behind a wall?

We stop work on that item, photograph it, explain your options, and put the added cost and time in writing. Nothing outside the agreed scope proceeds without your written approval, except immediate action needed for safety or by law.

02Do I need an engineer to open up my floor plan?

If a load-bearing wall or beam is involved, yes. The building department will want the change designed and stamped by a California licensed engineer or architect, and the new beam may need new posts and footings.

03My home was built before 1978. What changes?

Paid work that disturbs paint falls under the EPA's lead-safe renovation rule unless the paint is documented as lead-free. It affects how the work area is contained and cleaned, so it belongs in the scope from the start.

04Will a remodel trigger other upgrades?

Usually a few. Smoke alarms are brought up to new-home standards, noncompliant plumbing fixtures are replaced house-wide, and any heating, cooling or water heating system you replace has to meet the 2025 Energy Code.

05Who do I talk to during the project?

One point of contact, from the first walkthrough to the punch list, who knows the schedule, the selections and what decision we need from you next.

06Can you keep the original character of the house?

That is the aim. We plan the remodel around the existing architecture and settle drawings, materials and selections before demolition, so the finished rooms look like they belong to the house.

Related services

Often part ofthe same project

Most projects need more than one of these. One team runs all of it.

01

Concrete & Foundations

Footings, stem walls, slabs and flatwork as part of the build, set out so everything on top starts level and square.

Footings · Stem walls · Slabs · Flatwork

View service
02

Framing & Structural

Walls, floors and roofs framed true, square and plumb, with the headers, hangers and steel the drawings call for.

Wall framing · Roof framing · Structural steel · Subfloor

View service
03

New Construction

New homes built from the ground up, managed as one job from the first site walk to the keys.

Ground-up homes · Hillside lots · Turnkey · Permits

View service

Free estimate

Tell us whatyou want to build

Call (562) 340-8847 or send the short form. We walk the project first, then price it task by task.