Two-story house in pale yellow lap siding with new windows and house wrap around a bay window, roof work underway

Exteriors that keepthe weather out

Sheathing, weather barrier, siding and stucco detailed to shed water, plus pergolas and outdoor kitchens.

Exteriors & Outdoor Living

Where housesfail first

The envelope is where most homes fail first. As part of a build or a remodel we sheath, wrap and flash the house so it sheds water, finish it in siding or stucco with licensed trade partners where the trade calls for one, and build the outdoor rooms around it: pergolas, terraces and outdoor kitchens.

What’s included04 parts

  • Sheathing and wrap

    Sheathing, weather barrier and flashing detailed for water, not only looks.

  • Siding and stucco

    Lap siding, stucco and trim finished straight and sealed.

  • Windows and doors

    Openings set and flashed before the finish goes on.

  • Outdoor living

    Pergolas, terraces, built-in seating and outdoor kitchens.

In depth

How we build exteriorsthat keep water out

Stucco, siding and the barrier behind them, windows under the 2025 Energy Code, what fire hazard zones change in the foothills, and how we help you choose the colors.

The envelope is where houses fail first

Paint and trim are the parts people see. The sheathing, the weather barrier, the flashing at each window and door, and the way the siding or stucco sheds water are what keep the house dry. When those fail, the damage shows up inside.

We detail the envelope for water first and looks second. Sheathing and weather barrier, window and door installation, flashing and roof transitions, siding, stucco, trim and exterior finishes run as one scope, under the same management team that ran the framing.

Behind the cladding

The 2025 California Residential Code (CRC) asks every exterior wall to stop water from building up inside it. That takes two things: a water-resistive barrier behind the cladding, and a way for water that gets past the cladding to drain back out.

  • At least one layer of water-resistive barrier covers the studs or sheathing, continuous to the top of the wall and lapped with the flashing.
  • Flashing at windows and doors carries water to the outer face of the wall or onto the barrier, so it drains outward.
  • Air sealing goes around every window and door on the inside of the rough opening.

We check the laps, the flashing and the barrier before any lath or siding covers them, because nobody sees them again.

Stucco done to code

Stucco has its own section in the CRC:

  • Lath is corrosion resistant and fastened to the framing at no more than 7 inches apart along each member.
  • Barrier: in the code's dry-climate option, two separate layers of Grade D paper or an equal, each its own continuous plane, or one heavier layer with a drainage gap. Moist and marine zones add a drainage space of at least 3/16 inch or an equivalent drainage layer.
  • Weep screed runs at or below the foundation plate line, at least 4 inches above soil or 2 inches above paving, with the barrier lapping its flange so trapped water can get out.
  • Curing: each coat stays moist for at least 48 hours before the next. In three-coat work, the second coat waits at least 48 hours and the finish coat at least seven days after the second.

The lath gets its own inspection before any plaster goes on.

Windows and the 2025 Energy Code

New windows that replace old ones of the same total area have to meet the Energy Code's prescriptive U-factor and solar heat gain limits. Under the 2025 code the maximum U-factor is 0.27 in Climate Zones 1 to 5, 11 to 14 and 16, and 0.30 in Climate Zones 6 to 10 and 15. A small replacement of up to 75 square feet of windows may use a U-factor of up to 0.40. New glass in an existing sash and frame counts as a repair.

In homes built before 1978, window replacement always falls under the EPA's lead-safe renovation rule, whatever its size, unless the paint is documented as lead-free.

Fire hazard zones in the foothills

A large share of the foothills sits in a Fire Hazard Severity Zone. The State Fire Marshal maps the zones, and the local maps were released to cities in phases in early 2025. In Glendora, the March 2025 update designated 5,149 acres, about 27.3 percent of the city, as Very High, and the City Council adopted the new map in Ordinance 2094 in July 2025.

The 2025 code moved the wildfire construction rules for houses out of the residential code and into Part 7 of Title 24, the California Wildland-Urban Interface Code. Buildings built, modified or moved in a wildland-urban interface area follow its Chapter 5, which calls for ignition-resistant materials: noncombustible products, fire-retardant-treated wood rated for exterior use, or products that pass the code's fire tests. Paint and coatings don't count as protection. Additions to and remodels of buildings first built before July 1, 2008 are exempt from that chapter, though cities can adopt stricter local rules, so we confirm with yours.

Colors, permits, time and cost

Color decisions are where projects lose weeks. We photograph and measure the house as it stands, show four schemes on your own home (body, fascia, posts and garage together), then narrow it with you to two options and one recommendation. The choice goes to the field as a written spec.

Paint alone doesn't need a building permit under the state code. We confirm with your city what the rest of the scope needs during the walkthrough.

What drives time and cost: what sits under the old siding or stucco once it comes off, fire-zone materials, window sizes and ratings, lead-safe work on older homes, and curing time between stucco coats. We price each as its own task (how a task-by-task estimate works).

Sources

What it covers

From the wrapto the pergola

The full list, in the groups we work in. Ask about any of it when we walk the project.

01Envelope

  • Sheathing
  • Weather barrier and flashing
  • Window and door installation

02Finish

  • Lap siding
  • Stucco
  • Exterior trim and paint

03Outdoor living

  • Pergolas
  • Terraces and built-in seating
  • Outdoor kitchens
  • Fire pits

Job sites

From ourjob sites

Photos from the work itself. Open one to see it large on the projects page.

How we work

Four steps,in this order

Walk it, scope it, price it by the task, put it in writing. Then we build it.

  1. 01

    Walk the project

    We visit the property, look at the existing conditions, take measurements and photos, and listen to what you want from it.

  2. 02

    Scope and plan it

    We define the work, the materials and the permits it needs, and bring in the designer or engineer when the job calls for one.

  3. 03

    Price it by the task

    The job is broken into tasks, each with what’s included, its cost and what you get. Open selections carry stated allowances.

  4. 04

    Put it in writing

    Scope, price, payments and schedule go into a written agreement. Permits are in hand before that work starts.

Before we begin

Questions wehear most often

Something else on your mind? Call us at (562) 340-8847

01What goes behind new stucco?

Corrosion-resistant lath over a water-resistive barrier, two separate layers of Grade D paper or an equal in the code's dry-climate option, with flashing lapped into it and a weep screed at the bottom so trapped water can drain out.

02How long does stucco need between coats?

Each coat is kept moist for at least 48 hours before the next. In three-coat work, the finish coat goes on no sooner than seven days after the second coat.

03What do replacement windows have to meet?

The 2025 Energy Code's U-factor limit for your climate zone: 0.27 or 0.30, depending on the zone. Replacements totaling 75 square feet or less may use windows rated up to 0.40.

04Is my house in a fire hazard zone?

Check your address on the State Fire Marshal's Fire Hazard Severity Zone map or ask your city. In Glendora, about 27 percent of the city is now in the Very High zone.

05Do the fire-zone rules apply to a remodel of an older house?

The state's wildland-urban interface code exempts additions to and remodels of buildings first built before July 1, 2008 from its construction chapter. Cities can be stricter, so we check the local rules for your lot.

06How do you help us choose exterior colors?

We photograph your house, show four complete schemes on it, and narrow them with you to one recommendation, which goes to the field as a written spec.

Related services

Often part ofthe same project

Most projects need more than one of these. One team runs all of it.

01

Concrete & Foundations

Footings, stem walls, slabs and flatwork as part of the build, set out so everything on top starts level and square.

Footings · Stem walls · Slabs · Flatwork

View service
02

Framing & Structural

Walls, floors and roofs framed true, square and plumb, with the headers, hangers and steel the drawings call for.

Wall framing · Roof framing · Structural steel · Subfloor

View service
03

New Construction

New homes built from the ground up, managed as one job from the first site walk to the keys.

Ground-up homes · Hillside lots · Turnkey · Permits

View service

Free estimate

Tell us whatyou want to build

Call (562) 340-8847 or send the short form. We walk the project first, then price it task by task.