Wall framing and roof rafters seen from inside the frame against a blue sky

From the footingsto the finish

Foundations, framing, new homes, additions, ADUs and remodels across Pasadena, Glendora, Long Beach, Rancho Cucamonga and across LA County, run by one accountable team.

Our services

Seven kinds of work,one standard

Every one starts the same way: we walk the project and tell you what it needs.

01

Concrete & Foundations

Footings, stem walls, slabs and flatwork as part of the build, set out so everything on top starts level and square.

Footings · Stem walls · Slabs · Flatwork

View service
02

Framing & Structural

Walls, floors and roofs framed true, square and plumb, with the headers, hangers and steel the drawings call for.

Wall framing · Roof framing · Structural steel · Subfloor

View service
03

New Construction

New homes built from the ground up, managed as one job from the first site walk to the keys.

Ground-up homes · Hillside lots · Turnkey · Permits

View service
04

Additions & ADUs

Room additions, second storeys and accessory dwelling units, tied into the house you already have.

ADUs · Room additions · Second storeys · Garage conversions

View service
05

Kitchen & Bath Remodels

Kitchens and bathrooms taken down to the studs where they need it and rebuilt with the trades in order.

Kitchens · Bathrooms · Showers · Tile

View service
06

Full-Home Remodels

Whole-home renovations, open plans, stairs, doors and trim, with every trade run by one team.

Open plans · Stairs · Doors and trim · Flooring

View service

How we work

We walk it, scope it,price it by the task

The same four steps on every project, in this order.

  1. 01

    Walk the project

    We visit the property, look at the existing conditions, take measurements and photos, and listen to what you want from it.

  2. 02

    Scope and plan it

    We define the work, the materials and the permits it needs, and bring in the designer or engineer when the job calls for one.

  3. 03

    Price it by the task

    The job is broken into tasks, each with what’s included, its cost and what you get. Open selections carry stated allowances.

  4. 04

    Put it in writing

    Scope, price, payments and schedule go into a written agreement. Permits are in hand before that work starts.

The estimate

A price you canread line by line

We don’t hand you one number. The job is broken into tasks, each with what’s included, its cost and what you get, and selections you haven’t made yet carry a stated allowance.

How a task-by-task estimate works

Task-by-task estimateSample

  1. 01Protection and demolitionA clean, open area ready to buildFloor and path protection, removal of existing finishes, haul-off$ left blank
  2. 02Framing and structureA sound structure, ready for rough-inRepair or rebuild per plan, engineer-specified hardware where required$ left blank
  3. 03Rough plumbing and electricalSystems in, inspected, ready to closeLines and boxes per the approved layout, inspections as required$ left blank
  4. 04FinishesA finished space, ready to useDrywall, paint, flooring, trim, hardware; tile and fixtures as a stated allowance$ left blank
  5. 05Close-outA signed-off, complete projectJoint walkthrough, punch list, final clean$ left blank

Project totalAll tasks and stated allowances; exclusions listed separately$ left blank

Sample layout. Your estimate is built from your walkthrough.

Before we begin

Questions wehear most often

Something else on your mind? Call us at (562) 340-8847

01Do I need a permit for my project?

Most projects that change structure, add space, or install or rework electrical, gas, mechanical or plumbing systems need one. The California Residential Code exempts a short list: painting, tile, carpet, cabinets, countertops and similar finish work, fences up to 7 feet, retaining walls up to 4 feet with nothing loading them, and one-story detached sheds up to 120 square feet. Your city can add its own rules. We identify the permits during scoping and get them before that work starts.

02Can I build an ADU on my lot?

On a lot with a single-family home in a residential zone, state law has the city or county approve a converted ADU and a junior ADU inside the house or an existing accessory structure, plus a new detached ADU of up to 800 square feet with four-foot side and rear setbacks. Detached ADUs can go up to 1,200 square feet where local rules allow, and a city can’t set its maximum below 850 square feet. The review is ministerial, with no hearing. We walk the lot first to see what fits and what the site adds.

03How much do I pay up front?

On a home improvement contract, California caps the down payment at $1,000 or 10 percent of the contract price, whichever is less. After that, each payment has to match work completed or materials delivered, on a written schedule. We tie payments to defined phases on every project.

04How does a task-by-task estimate work?

We break the project into tasks or phases, each with what’s included, its cost and what you have when it’s done. Selections you haven’t made yet carry allowances, and exclusions and assumptions are listed. Approved scope, price, payment terms and schedule then go into a written agreement.

05How do change orders work?

A change becomes part of the contract only when it’s written and signed by both of us before the changed work starts. Each one states the scope, the amount added to or taken off the price, and its effect on the payment schedule and completion date. We price additions like the original estimate: their own line, cost and deliverable.

Free estimate

Tell us whatyou want to build

Call (562) 340-8847 or send the short form. We walk the project first, then price it task by task.