Two-story Spanish-style home with cream stucco, a red clay tile roof, black-framed windows and a tiled entry stair

New homes, frombare lot to keys

New homes built from the ground up, managed as one job from the first site walk to the keys.

New Construction

One process,one team

We take a new home from the lot to the final walkthrough: site work, foundation, framing, the envelope, the systems and the finishes, with the architect, the engineer, the city and every trade coordinated by one accountable team.

What’s included04 parts

  • Pre-construction

    Plans, engineering, budget and permits sorted before the ground is broken.

  • The structure

    Foundation and framing, the part of the house that can’t be fixed later.

  • Systems and envelope

    Plumbing, electrical and HVAC coordinated; the house sheathed and dried in.

  • Turnkey finish

    Finishes, final inspections, the punch list and the keys.

In depth

How we build a new home, frombare lot to final inspection

The order a ground-up build runs in, what the 2025 codes add to a new California house, and what moves the schedule between plan check and move-in.

One process, one team

We build new homes from the ground up and run them as one continuous process, from the design on paper to the key in your hand. A typical scope covers excavation, grading and site prep; foundation, rebar and slab; the shell and the building envelope; the interior build-out; and the systems that tie it together.

Concrete, framing and structure are our core work. Electrical, plumbing and HVAC come from licensed trade partners we coordinate under one schedule. Our network of architects and engineers covers design and structure, and Aaron stays on site through the parts that get covered up.

Plans, plan check and permits

LA County describes the permit process in five steps: application, plan check, permit, inspection and completion. Simple plans can be checked over the counter. Larger projects are taken in and reviewed in the order received, and the county says turnaround depends on how many plans are in line. Other agencies often have to sign off before the permit issues, and the applicant collects those approvals.

Cities list what they expect up front. Long Beach's guide for new one- and two-family homes asks for a soils or geotechnical report for anything over one story, a geologic hazard study in a hazard zone, low impact development (stormwater) standards for new construction over 500 square feet, and school district fees. When the plan checker sends corrections, the plans are revised and resubmitted until they are approved.

Pre-approved plans can shorten plan check. The City of Los Angeles runs a Standard Plan Program for single-family homes and ADUs, and every standard plan still gets a final LADBS review for the specific site.

A permit has a clock. In LA County, an application expires if no permit issues within 12 months, and a permit expires if work doesn't start within 12 months or stops for more than 180 days.

What the 2025 codes add to a new house

Permits applied for since January 1, 2026 fall under the 2025 California Building Standards Code. For a new single-family home that means, among other things:

  • Fire sprinklers. The California Residential Code requires an automatic sprinkler system in new one- and two-family dwellings.
  • Heat pumps. The Energy Code's prescriptive path calls for heat pump space heating in every climate zone, unless the design shows compliance through the performance path.
  • Solar and batteries. New single-family homes get a solar PV system sized from the roof's solar access area, and homes with electrical service over 125 amps must be ready for a battery system unless one is installed.
  • EV readiness. CALGreen asks for a 1-inch raceway from the panel to a box near a future charger in homes with attached garages, plus panel capacity for a 40-amp, 208/240-volt circuit.
  • Less waste. At least 65 percent of construction and demolition waste is recycled or salvaged. Glendora asks covered projects for a waste management plan.

The build, in order

The California Residential Code sets the inspections, and the build follows them:

  1. Foundation, once trenches are dug, forms set and steel in place, before the pour. Slab and under-floor work is inspected before the concrete or subfloor covers it.
  2. Rough plumbing, mechanical, gas and electrical, before anything is concealed and before the frame inspection.
  3. Frame, once the roof, framing, firestopping and bracing are in. The framing's moisture content is checked here: CALGreen bars closing walls above 19 percent.
  4. Lath and drywall, before plaster or taping.
  5. Final, after the permitted work is complete and before anyone moves in.

We book each inspection as the stage is ready, through EPIC-LA in unincorporated LA County or through the city's own system, such as Pasadena's online Permit Center. Glendora and Rancho Cucamonga both offer next-day inspections. We walk each stage before the inspector does. Our pages on foundations and framing cover those stages in detail.

Final inspection and the keys

The final inspection happens once the work is done and before occupancy. CALGreen also asks for an operation and maintenance manual to be left in the house at final. In LA County a project is complete when the final is signed and the agency approvals are in, and a certificate of occupancy is issued for the building. Long Beach's inspector also authorizes the utility connections at final.

On our side, the job closes with a walkthrough together, a punch list finished before we call it done, a final clean, and a record of what was built.

What moves the schedule and the budget

New homes run on outside clocks: plan check rounds, outside agency approvals, the soils report, grading on a hillside lot, and fire-zone materials on lots in a Fire Hazard Severity Zone. Selections matter too. Items not yet chosen carry a stated allowance, and the line is adjusted to the actual cost when you choose. Changes go through a written change order with the price and schedule effect, signed before that work starts.

We price the build by task or phase, each with what it includes and what it delivers. How a task-by-task estimate works shows the format.

Sources

What it covers

From plan checkto the final walk

The full list, in the groups we work in. Ask about any of it when we walk the project.

01Planning

  • Pre-construction planning and budgeting
  • Architect and engineer coordination
  • Plan review and city permits

02Building

  • Site work and foundations
  • Framing and structure
  • Envelope: sheathing, weather barrier, windows
  • Electrical, plumbing and HVAC coordination

03Finishing

  • Drywall, flooring, tile and trim
  • Inspections
  • Punch list and final walkthrough

Job sites

From ourjob sites

Photos from the work itself. Open one to see it large on the projects page.

How we work

Four steps,in this order

Walk it, scope it, price it by the task, put it in writing. Then we build it.

  1. 01

    Walk the project

    We visit the property, look at the existing conditions, take measurements and photos, and listen to what you want from it.

  2. 02

    Scope and plan it

    We define the work, the materials and the permits it needs, and bring in the designer or engineer when the job calls for one.

  3. 03

    Price it by the task

    The job is broken into tasks, each with what’s included, its cost and what you get. Open selections carry stated allowances.

  4. 04

    Put it in writing

    Scope, price, payments and schedule go into a written agreement. Permits are in hand before that work starts.

Before we begin

Questions wehear most often

Something else on your mind? Call us at (562) 340-8847

01How long does a new home take to build?

It depends on the lot, the design and how long plan check and outside approvals take, and the city sets those review times. We build the review times into the schedule and put a projected schedule in the written agreement once the scope is clear.

02Does a new house in California need fire sprinklers?

Yes. The California Residential Code requires an automatic fire sprinkler system in new one- and two-family dwellings.

03Do new homes have to have solar panels?

Under the 2025 Energy Code's prescriptive path, new single-family homes get a solar PV system sized from the roof area that can support it. Homes with electrical service over 125 amps must also be wired ready for a battery.

04Can we build from a pre-approved plan?

In some places, yes. The City of Los Angeles keeps a catalog of pre-approved standard plans for single-family homes and ADUs, which shortens plan check. Each one still gets a site-specific review before the permit issues.

05Do I need a soils report?

Often. Building officials can require one where soils are expansive or unstable, and some cities ask for one on any house over one story. The concrete and foundations page explains how the report shapes the footings.

06Who pulls the permit?

We identify the permits during scoping and obtain them before that work starts. LA County notes there is an advantage to having permits issued to a licensed contractor, since Building and Safety can then verify the license and insurance.

Related services

Often part ofthe same project

Most projects need more than one of these. One team runs all of it.

01

Concrete & Foundations

Footings, stem walls, slabs and flatwork as part of the build, set out so everything on top starts level and square.

Footings · Stem walls · Slabs · Flatwork

View service
02

Framing & Structural

Walls, floors and roofs framed true, square and plumb, with the headers, hangers and steel the drawings call for.

Wall framing · Roof framing · Structural steel · Subfloor

View service
04

Additions & ADUs

Room additions, second storeys and accessory dwelling units, tied into the house you already have.

ADUs · Room additions · Second storeys · Garage conversions

View service

Free estimate

Tell us whatyou want to build

Call (562) 340-8847 or send the short form. We walk the project first, then price it task by task.